The project to install solar panels at Chester’s water treatment plant required extensive survey and mitigation work and a biodiversity net gain design to provide improvements for local nature
Tag Archives: phase 1 habitat survey
Meadow Assessment – Llanharan
An assessment of the ecological value of old meadows prior to preparing a bid to include the site in the Local Development Plan highlighted potential difficulties with development.
Ecological Survey Calendar
Nature doesn’t work to our timetables, but local authority ecologists will expect that surveys will have been conducted at the optimum time for the subject species.
New Use for Pontrhydyfen Primary
Purchased in 2020, the new owners of Pontrhydyfen Primary had interesting development plans for which they needed planning permission and supporting ecological reports.
Solar Power for Ponthir Water Treatment
The proposed installation of solar panels required a combination of surveys and recommendations to enable the project aims to be achieved whilst protecting and enhancing the habitats for some species.
